Skip to main content
Manager checking standing by pipes and checking natural gas supply.
Programs

Gas Systems

Program Code Chapter: SPS 340 and SPS 343.

  • Disclaimer: Review WI statute for full program requirements


Overview

Performs plan reviews and inspections on anhydrous ammonia, compressed natural gas, liquid natural gas, liquid petroleum gas, and liquid and gaseous hydrogen systems.

Plan Review

Plan review is required for these systems:

  • Liquid Petroleum Gas - 2000 gallon and larger, or aggregate water capacity exceeds 4000 gallons

  • Compressed Natural Gas - any size installation unless the tank is outdoors with no storage capacity

  • Liquid Natural Gas - any size installation

  • Gaseous Hydrogen - has a total storage capacity of more than 400 cubic feet of compressed hydrogen gas

  • Liquefied Hydrogen - has a total storage capacity of more than 39.7 gallons of liquified hydrogen

  • Vehicle-fuel dispensing system - any size installation

  • Anhydrous Ammonia Storage - any size installation

Plans must be submitted to DSPS via esla.wi.gov. You will need to provide:

  1. Owner information.

  2. Site location.

  3. Fire Department name or ID.

  4. System information.

  5. System documentation including:

    1. Completed form SBD-6038, Application for Gas System Installation.

    2. Scaled plans indicating property lines and roads. (Recommend minimum scale of 1 inch = 20 feet however for NH3 plans, plot plan showing land use within 2000 feet does not require minimum scale but should indicate land use within 2000 foot radius drawn on such drawing.)

    3. Piping schematics and specifications including identification of materials, piping (welded or threaded), valves, fittings, hoses, check/excess flow valves, corrosion protection.

    4. Calculations providing the size, capacity, surface are of each tank, MDR info, and system design pressure.

    5. Tank support information such as clearances, type of venting, pressure relief used with combined capacity on each container, foundation design and support.

    6. Dispenser information showing location of emergency controls, location of dispensers, and details of dispensing devices.

  6. Plan review fee payment.

Note that scaled plans should be clear, legible and permanent, include names of adjacent streets, alleys, railways and highways, indicate property and lot lines in all directions, show all buildings on property with type of construction, the layout of buildings, containers, loading and unloading docks and any body of water within 150 feet of the containers must be identified. Welded piping requires ASME qualified welders with welding documentation.. 

See the eSLA Information page for user guides and general instructions.

Inspection

Installation

Installation inspection is required for any system requiring plan review.

The installer must notify the gas systems inspector at least 5 business days prior to the start of construction. The inspector will bill the installer directly for inspection fees.

The installer must also complete SBD-9656-E, Certificate of Installation/Testing, upon each system installation. See the Gas Systems Certificate of Installation FAQs for more information.

Piping Fabrication and Welding

Inspection is required prior to starting fabrication. Materials, valves, and fittings must meet ASME B31.3. Keep welder documentation on site including:

  1. Weld Procedure Specification (WPS)

  2. Procedure Qualification Record (PQR)

  3. Welder Performance Qualification (WPQ)

  4. Welder's Continuity Log

Other

Periodic inspections are required for anhydrous ammonia and hydrogen systems.

Owners may request additional inspections.

Resources

Report an Accident

During regular business hours, call 262-524-3950.

After hours, weekends, or holidays, call Wisconsin Emergency Management after-hours incident reporting at 1-800-943-0003 x2.

Contact Us

Use the Inspector Look-Up Tool to determine the DSPS-appointed inspector for your county.

DSPS maintains program-specific email inboxes (tech boxes) to answer general code questions. Responses should not be construed as formal code interpretations nor do they supersede any previously issued correspondence from DSPS. Tech boxes should not be used for projects where code officials are already involved.

For general questions not related to specific programs or technical codes, use these contacts:

Subscribe to email updates from DSPS and receive upcoming announcements and notifications.

  1. Go to https://public.govdelivery.com/accounts/WIDSPS/subscriber/new

  2. Enter your email address and click Submit.

  3. Under Subscription Topics, expand the Industry Updates section.

  4. Check all the topics of interest to you.

  5. Scroll to the bottom and click Submit.

More Information

Related Pages

You may be interested in the pages below.

Codes and Statutes

Explore codes and statutes for DSPS public safety programs.

Credentialing

Look up DSPS credentials.

Back to top button